MRBench: Benchmarking Physical Necessity Reasoning in Heterogeneous Multi-Robot Manipulation

Yanzhe Chen*, Zhijun Cao*, Ruihe An*, Chang Gong*, Mike Zheng Shou†

Show Lab, National University of Singapore

*Equal contribution·†Corresponding author

“Plurality is never to be posited without necessity.”William of Ockham

Abstract

Recent advances in multi-robot manipulation have shown how robots can collaborate to accomplish complex tasks. However, successful coordination does not reveal which robots are actually needed. The same task may require different teams as robot capabilities change, resources become unavailable, or objects replace robotic support. We argue that reliable multi-robot manipulation requires physical necessity reasoning: understanding what a task demands, which resources can fulfill those demands, and which are truly necessary. We introduce MRBench, a benchmark for physical necessity reasoning in heterogeneous multi-robot manipulation. It comprises eight tasks with distinct concurrency and reach constraints, each evaluated under five configurations that change the required resources while preserving the task goal. Our evaluation reveals that existing coordination agents perform well with reference teams but struggle when robot embodiments change or passive objects can replace robotic support. To address this gap, we propose MRScissors, which separates task requirements from measured physical capabilities and identifies minimal feasible teams through constrained search. Across two model backbones, MRScissors achieves 85.4% and 91.2% team-selection accuracy, outperforming the strongest baselines by 10.4 and 9.5 points, respectively. Together, these findings expose a critical gap between coordinating robots and understanding their physical necessity.

BenchmarkOverview

Two suites, five configurations

A task is a set of jobs done by doers. It needs several arms when jobs at different places must happen at once (Concurrency) or lie beyond one arm's reach (Reach). Five configurations keep each task's goal and change only its doers, so the smallest team that can do it changes while the instruction does not.

Physical necessity depends on what the task demands and what is on the table. Left: Concurrency tasks need simultaneous actions; Reach tasks need every work site covered. Right: one goal, five different teams. Each configuration but the reference defeats a shortcut that skips measuring: staffing by presence (surplus), presumed feasibility (shortfall), roles by place (swapped) and substitution by appearance (borrow).

Jobs, doers and minimal support sets, in symbolsthe formal definition

Jobs

Each job has sites, where a hand must act, and a failure signal. The jobs of a group must happen at once.

j∈J,Sj,g∈𝒢⊆2J

Doers

Arms at fixed places, and passive objects that can take a job over. An arm can do a job if it reaches every site with margin and opens wide enough.

c(a,j)=1⟺ρa(s)≥δj∀s∈Sj,wj≤oa

Minimal support sets

The smallest feasible teams. Any one is a right answer; none means the task is infeasible.

MSS(A,P)=argminT⊆Afeasible|T|
An answer settles Minimalitywho is neededFeasibilitywhether it can be doneSubstitutionwhat can stand in for an arm
BenchmarkTasks

Every task in every configuration

Eight tasks in five configurations give 40 versions and 480 scenes. The instruction gives only the goal: no arm, role, step or tool.

Level

Overview of the eight tasks in MRBench. Each at a key moment of its scripted reference (exact, easy level), with its steps in order and when (Concurrency) or where (Reach) each arm works.

How every scene is built, and the protocolthe table, the checks, what a method is not given

How every scene is built

One table has three fixed places, west, south and east, and a fourth, north, for the surplus arm; each takes a Franka, a PiPER or an SO-101 (Isaac Sim 4.5, Isaac Lab 2.1). The right team is computed, from IK with margins and an exact search for the smallest feasible teams, then checked in simulation.

312 / 312feasible scenes in which the scripted reference succeeds
96 / 96borrow scenes in which the distractor fails as designed

The protocol: four conveniences removed

It removes four conveniences that multi-robot benchmarks offer and real workcells do not.

01

No team is given

A method gets the goal, each arm's model, place and orientation, and the objects, but no role, skill list or reach.

02

Feasibility is not promised

14 of the 40 versions are infeasible, and “these jobs cannot all have a doer” is then the answer.

03

Names do not decide

A prop and its distractor look alike, and masses are given only within a factor of 0.75 to 1.3, so fitness must be measured.

04

Failure is not proof

A failed run's report names the jobs whose signals fired; only such a signal, not a missed grasp, counts against a smaller team.

MethodModel and code

MRScissors

The model writes what the task needs as a job graph, code measures who can do it into a capability table, and an exact search over that table returns the fewest arms.

Overview of MRScissors on Spring Doors, borrow: no east arm, two weights.

  1. Job graph from a blind prover

    One session writes the jobs, their sites and groups from the goal and the scene. It is not told which arms exist, so it cannot write the task to suit them.

  2. Measured capability table

    Code fills every cell from tool results: who_can for every arm at every site, meet for hand-overs, measure for objects.

  3. Exact search and certificate

    From one arm up, it returns every smallest team, with what each arm's removal leaves undone and each object used or rejected.

  4. Stand-in objects

    When no team exists, the prover, still blind, is told which jobs lack a doer and asked what on the table could take them over.

  5. Review with unequal burdens

    Two reviewers, blind to each other, look for what was written easier or harder than the task; every edit cites its own tool call.

ExperimentsOne shot

Main results

Five methods, each given the same information, tools and output form, answer all 480 scenes in one shot with Qwen3.8-Max and with Claude Sonnet 5.5. Feasible answers are then carried out in Isaac Sim by a shared executor.

Leaderboard

Team-selection accuracy (%) · one shot · 480 scenes

Backbone

Accuracy (%) of the team named, 96 scenes per configuration and 480 in all. Task: all five configurations of a task-scene right. MSS-SR: right team and a successful run, on the 312 feasible scenes. Click a column to rank by it.

Backbone
By configuration

MRScissors names the right team most often on both backbones

Task level

The gap is widest at the task level

A task-scene, one task at one level and seed, counts only when all five of its configurations are right. MRScissors' squares are red for Concurrency's tasks and blue for Reach's. Hover a square.

all five rightnot all fivea column is a task; a row, a level and a seed
Task by configuration

A swapped arm separates the methods most

Each cell is one task in one configuration, 12 scenes; deeper color, more scenes right. The dashed column is swapped, where what a new arm reaches has to be known.

Execution

From the right team to task success

Right teams carry different solutions. The executor carries out a method's whole answer, so success scores its solution as well as its team. MRScissors' steps are read off its certificate, where each job's doer is a measured cell.

● right team (%) → ○ right team and task done (MSS-SR, %), on the 312 feasible scenes
Cost

MRScissors uses fewer tokens than every adapted method

Bubble area: model sessions per episode; a line joins a method's two backbones.

Backbone

A stronger backbone teaches every method to say no

On shortfall the right answer is infeasible. Both backbones are shown at once.

Shortfall scenes answered infeasible (%), on each backbone; hover a mark for its value

BibTeX

@article{chen2026mrbench,
  title={MRBench: Benchmarking Physical Necessity Reasoning in Heterogeneous Multi-Robot Manipulation},
  author={Chen, Yanzhe and Cao, Zhijun and An, Ruihe and Gong, Chang and Shou, Mike Zheng},
  journal={arXiv preprint arXiv:2611.32803},
  year={2026}
}